So little time so much to do

I need to set my priority to conclude all my works, since everything happen at the same time. Well, here is the list:

1. Manage the construction site

2. Looking for the plumbers and electrical workers

3. Design the mass housing building

4. Manage renovation of the flat, need to find the carpenters

5. Manage the final studio.

6. Manage the computer lab

7. Design the home office

8. Manage the lecture architecture theory and the 2 studios.

9. Manage the financing reports

10. Check and control the Grissik project

11. Maintain the communication of the previous office

I can’t think the rest, but I still missing one or two items. I will add it later when I can remember it.

Advertisement

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.