So little time so much to do
I need to set my priority to conclude all my works, since everything happen at the same time. Well, here is the list:
1. Manage the construction site
2. Looking for the plumbers and electrical workers
3. Design the mass housing building
4. Manage renovation of the flat, need to find the carpenters
5. Manage the final studio.
6. Manage the computer lab
7. Design the home office
8. Manage the lecture architecture theory and the 2 studios.
9. Manage the financing reports
10. Check and control the Grissik project
11. Maintain the communication of the previous office
I can’t think the rest, but I still missing one or two items. I will add it later when I can remember it.
Advertisement